Project Description

With conceptual design analysis and detailed financial analysis, we were able to help a major utility company uncover some of the most cost-effective solutions available on a unit cost basis.

Project Components:

  • ENCAP-IT

  • Engineering Consulting

  • Material Procurement

  • Construction

0M cy
CCR DEPOSITION – VOLUME
0%
CCR BENEFICIAL USE
0
UNIT COST PER CY
0%
SAVINGS